ROI worksheet (expected and downside)
Use with the business case. Hard savings first. Hours saved are a soft estimate, not hard ROI.
During early access, subscription cost is $0. For a post-billing scenario, use the published $69/user/year unless you have a written quote.
| Line | Formula | Expected | Downside |
|---|---|---|---|
| A. Seats | Buyer input | ||
| B. Price per seat per year | List $69, or $0 in early access | ||
| C. Annual subscription | A × B | ||
| D. Hard savings (cancelled tools, etc.) | Buyer input; $0 if none | ||
| E. Net hard $ | D − C | ||
| F. N, H, S, W | See business case | ||
| G. Hours/year (estimate) | N × H × S × W | ||
| H. Soft $ view of time | G × your $/hour, if required | ||
| I. Do not add H into E | Hours are not hard savings | — | — |
A worked illustration only (not a promise): 10 seats, early access so C = $0, no cancelled tools so D = $0, net hard $ = $0. Soft estimate at S = 5%, H = 15, W = 48: 360 hours/year. Downside at S = 0%: 0 hours. Finance should look at E first.
Optional calculator. Nothing here is hard ROI unless it is a cost you would actually stop paying. Hours are a soft estimate.
Last updated 10 November 2026.